Installation of double column lift
Installation of double column lift
The two post lift is very demanding on the ground, especially the floor-type double-column lift. Because there is no beam to offset the torsion of the column, the ground base is more stringent. The Cavaliers require a one-time concrete floor structure with a thickness of not less than 375px and no steel bars. If the thickness is not enough for 15CM or twice for concrete, the foundation needs to be reworked. The foundation of the double-column lift will not be too difficult. With the pillar as the center, you can dig two pits of 1m*1m*deep 0.45m! It can be installed in about 10 days!
The double-column lift is very demanding on the ground, especially the floor-type double-column lift. Because there is no beam to offset the torsion of the column, the ground base is more stringent. The Cavaliers require a one-time concrete floor structure with a thickness of not less than 375px and no steel bars. If the thickness is not enough for 15CM or twice for concrete, the foundation needs to be reworked. The foundation of the double-column lift will not be too difficult. With the pillar as the center, you can dig two pits of 1m*1m*deep 0.45m! It can be installed in about 10 days!